Customization: | Available |
---|---|
Type: | Distribution Metering Box |
Structure: | Protection |
Still deciding? Get samples of US$ 6/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Name
|
PV combiner box
|
|
System maximum de voltage
|
1000
|
|
Maximum input current for each string
|
20A
|
|
Maximum input strings
|
2
|
|
44Maximum outpui switch current
|
40A
|
|
Number of invener MPPT
|
1
|
|
Number of Outpui strings
|
1
|
|
Category of test
|
II grade protection
|
|
Nominal discharge current
|
20kA
|
|
Maximum discharge current
|
40kA
|
|
Voltage protection level
|
3.8kV
|
|
Maximum continuous operating voltage Uc
|
1000V
|
|
Poles
|
3P
|
|
Structure characteristic
|
Plug-push module
|
|
Operating Temperalure
|
Wall mourning type
|
|
Installation method
|
Wall mourning type
|
Q1:.What is working time?
A:08:30-17:00 (GMT+8 Beijing), from Monday to Saturday.
24 Hours customerservice
For any query or problem , please contact us :
Q2: Will my drawing be safe after you get it?
A:Yes, we will not release your design to third party unless with your permission. And we
can sign the NDA before you send the drawing.
Q3: What is the MOQ?
A: Usually we don't set MOQ, but the more, the cheaper. Besides, we are happy to make
prototype or sample for clients to ensure quality standard.
Q4:Whether some samples can be provided?
A: Yes, We can supply the sample if we have ready parts in stock, but the customers have
to pay the sample cost and the courier cost.
Q5: What is your terms of payment?
A: T/T 50% as deposit, and 50% before delivery. We'll show you the photos of the products
and packages before you pay the balance.
Q6: How about your delivery time?
A: Generally, it will take 5-7 days after receiving your advance payment. The specific delivery
time depends on the items and the quantity of your order