Customization: | Available |
---|---|
Type: | Low-voltage |
Structure: | Waterproof |
Still deciding? Get samples of US$ 12.3/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Electrical Characterisitics | |
Type | FMPV16-ELR2,FMPV25-ELR2,FMPV32-ELR2 |
Function | Isolator,Control |
Standard | IEC60947-3,AS60947,3 |
Utilization category | DC-PV2/DC-PV1/DC-21B |
Pole | 4P |
Rated frequency | DC |
Rated operational voltage(Ue) | 300V,600V,800V,1000V,1200V |
Rated operational voltage(Ie) | See the next page |
Rated insulation voltage(Ui) | 1200V |
Conventional free air themal current(Ith) | // |
Conventional enclosed thermal current(Ith) | Same as Ie |
Rated short-time withstand current(Icw) | 1kA,1s |
Rated impulsed withstand voltage(Uimp) | 8.0kV |
Overvoltage category | II |
Suitability for isolation | yes |
Polarity | No polarity,"+"and"-"polarities could be interchanged |
Service life/cycle operation | |
Mechanical | 18000 |
Electric | 2000 |
Installation Environment | |
ingress protection | Enclose | IP66 |
Storage temperature | -40ºC~+80ºC |
Mounting Type | vertically or horizontally |
Pollution degree | 3 |
Q1:.What is working time?
A:08:30-17:00 (GMT+8 Beijing), from Monday to Saturday.
24 Hours customerservice
For any query or problem , please contact us :
Q2: Will my drawing be safe after you get it?
A:Yes, we will not release your design to third party unless with your permission. And we
can sign the NDA before you send the drawing.
Q3: What is the MOQ?
A: Usually we don't set MOQ, but the more, the cheaper. Besides, we are happy to make
prototype or sample for clients to ensure quality standard.
Q4:Whether some samples can be provided?
A: Yes, We can supply the sample if we have ready parts in stock, but the customers have
to pay the sample cost and the courier cost.
Q5: What is your terms of payment?
A: T/T 50% as deposit, and 50% before delivery. We'll show you the photos of the products
and packages before you pay the balance.
Q6: How about your delivery time?
A: Generally, it will take 5-7 days after receiving your advance payment. The specific delivery
time depends on the items and the quantity of your order